  • Federal Contract – Waterline
  • New Construction
  • 3 Miles of Underground Waterline
  • Completed Ahead of Schedule
  • Overall Cost Savings to the Owner
  • Zero Reportable Injuries/Lost Workdays
  • Value Engineering Features Included
  • Self-Performed 20% of Scope
  • Superior Letter of Recommendation
  • “Outstanding” Owner Evaluation

The scope of work consisted of furnishing all labor, materials, and equipment in connection with the design and construction of approximately 3 miles of underground waterline from South Gate SLC 3, Station 200+00 to Bear Creek Road along Arguello Boulevard and from Station 95+45 to Station 153 + 82 along Bear Creek , and furnishing all labor, materials, and equipment in connection with replacing the pressure reducing valves and all components at Station 200+00 on Arguello Boulevard and at the corner of Monroe Road and Sweeny Road.