Reserve Training Center

 

FORT HUNTER LIGGETT, CA

Project Type: Design-Build

Owner: US Army Corps of Engineers

Architect: KMA Architects

Value: $12,058,761

Award: 13 June 2007

Completion: 30 March 2009

    • Military Training Facility

    • New Construction

    • 42,765 Total Square Feet

    • Overall Cost Savings to the Owner

    • Zero Reportable Injuries/Lost Workdays

    • Sustainable Design Features Included

    • “SPiRiT” Silver Level Certification

    • Self-Performed 19% of Scope

    • “Above Average” Owner Evaluation

 

Located on approximately seven acres, the Reserve Training Center consisted of a new 200 member 45,500 SF Army Reserve Center and a 915 SF unheated storage facility.

The two-story steel framed facility is primarily used for training of personnel with administrative, storage and other miscellaneous support areas. The center is constructed of concrete tilt-up wall panels with an elastomeric coating to match the installation criteria of an off-white finish stucco appearance.

This economical system also provides a more durable exterior finish than traditional stucco used in the Fort Hunter Liggett environment. The facility includes slab on grade first floor, structural steel beam and joist second floor framing with metal deck and concrete fill, and a low-slope modified bituminous roof with a parapet and interior roof drains and overflow scuppers. The storage facility is a pre-engineered metal building.

The building utilizes low maintenance, quality materials, which provide durability as well as a high level of reliability suitable to the functionality of the facility. The facility meets all ADA requirements and was designed to meet the SPiRiT “Silver” level of certification.

Previous
Previous

Santa Maria Library

Next
Next

Force Intelligence Operations Center